SAP PI/PO to SAP Integration Suite Migration: A Practical Roadmap for 2026 and Beyond

Turn an approaching maintenance deadline into a disciplined integration-modernisation programme-one that simplifies the estate, strengthens governance and protects critical business flows.

7 phases

END-TO-END ROADMAP

5 treatments

RETIRE TO RETAIN

4 factors

WAVE PRIORITISATION

2027

PLANNING MILESTONE*


For organisations running SAP Process Integration or SAP Process Orchestration (PI/PO), migration planning is no longer a d
istant roadmap item. SAP PI/PO on SAP NetWeaver 7.5 approaches the end of mainstream maintenance in 2027, with extended maintenance available to 2030 for eligible customers. That creates a clear planning horizon, but the programme should not be treated as a hurried technical replacement.

A successful SAP PI/PO to SAP Integration Suite migration is an opportunity to simplify the integration estate, strengthen governance and support cloud, API and event-driven scenarios. The best programmes combine portfolio assessment, target architecture, selective redesign, automated tooling where appropriate, rigorous testing and an operational model that is ready before go-live.

Terminology Matters:

SAP Cloud Platform Integration, often searched for as SAP CPI, is now known as the Cloud Integration capability within SAP Integration Suite. SAP Integration Suite is the broader integration platform and can include capabilities such as Cloud Integration, API Management and event-driven integration. These terms should not be used interchangeably without context.

The maintenance timeline is important, but it should not be the only reason to move. The stronger business case is integration modernisation: reducing ageing middleware dependencies while building an architecture that can support SAP S/4HANA, SaaS applications, partner ecosystems, APIs and real-time events.

  • A managed cloud integration platform can reduce responsibility for underlying middleware infrastructure, although subscription, network, security and operating costs still require active management.
  • Prepackaged integration content, adapters and APIs can accelerate delivery when they fit the business scenario and are governed consistently.
  • Cloud Integration supports hybrid connectivity across cloud and on-premise applications, enabling staged transformation rather than a forced all-at-once move.
  • Central monitoring, message tracking and alerting can improve support visibility when observability, ownership and escalation procedures are designed properly.
  • API-led and event-driven patterns can reduce point-to-point complexity and make new digital services easier to extend.
  • Modern DevOps practices can improve transport control, versioning, automated testing and release repeatability across integration environments.

These outcomes are not automatic. A poorly governed cloud platform can recreate the same customisation, monitoring and support problems found in a legacy landscape. Architecture standards and operational discipline remain essential.

DimensionSAP PI/POSAP Integration Suite target state
DeploymentCustomer-managed, NetWeaver-based middlewareCloud-based integration platform on SAP Business Technology Platform
Core design artefactIntegration Directory and ESR objectsIntegration flows (iFlows), APIs, events and reusable packages
ScalingBound by installed infrastructure and capacity planningService-based scaling within contracted entitlements and platform limits
OperationsPI/PO monitoring and customer-built operational processesCloud monitoring, message tracking, alerting and optional integration with enterprise observability tools

Lifecycle
Patches, upgrades and infrastructure managed by the customerSAP manages the cloud service; customers still manage content, releases, security, connectivity and support processes
Modernisation scopePrimarily message and process integrationCloud integration plus API, event and partner-integration patterns, depending on licensed capabilities
Many PI/PO interfaces contain years of custom mappings, Java functions, adapter dependencies and business exceptions. Moving every object unchanged would preserve technical debt and can produce an expensive cloud replica of the old estate. Instead, each scenario should be assigned a deliberate treatment:

Retire

Remove integrations that no longer support an active business process.

Replace

Use supported standard content or application APIs where practical.

Migrate

Use SAP migration tooling for suitable patterns, then validate every generated artefact.

Modernise

Redesign high-value scenarios using APIs, events, canonical models or simpler mappings.

Temporarily retain

Keep scenarios not yet ready, supported by a documented and governed exit plan.

SAP’s Migration Assessment capability can help estimate effort and identify modernisation opportunities. Migration tooling is pattern-based, so generated content still requires expert review, remediation, testing and operational hardening.

Use the roadmap below as an interactive programme spine. Select any phase to see its objective and principal design focus.

Seven connected phases · select a step to explore

Step - 1

Establish the case for change

Confirm business drivers, maintenance exposure, programme outcomes, funding, governance and the relationship to SAP S/4HANA or wider cloud transformation.

Step - 2

Discover and assess the portfolio

Extract the interface inventory and capture ownership, source, target, volume, criticality, SLA, protocol, mapping complexity, custom code, security, dependencies and incident history.

Step - 3

Design the target architecture

Define when to use Cloud Integration, APIs, events or other platforms. Establish connectivity, identity, certificates, secrets, routing, residency, logging, retention and environment standards.

Step - 4

Classify and sequence migration waves

Group interfaces by process, dependency and risk. Start with representative controlled scenarios, then reuse proven patterns before critical flows.

Step - 5

Build, migrate and modernise

Use standard content and migration tooling where they add value. Redesign unsupported or over-engineered mappings and externalise configuration.

Step - 6

Test end to end

Complete unit, integration, regression, volume, performance, resilience, security and operational-acceptance testing. Reconcile business outcomes, not just acknowledgements.

Step - 7

Cut over, stabilise and decommission

Use rehearsed cutover plans, controlled parallel running where justified and clear rollback criteria. Confirm retention and audit obligations before removing PI/PO.

A practical wave plan balances delivery speed with business risk. Score each interface against four factors:

01

Business criticality

Revenue, supply, finance, payroll, regulatory

02

Technical complexity

Adapters, mappings, BPM, payloads

03

Dependency

S/4HANA, SaaS and partner releases

04

Reuse potential

Security, mapping, API and exceptions
FactorQuestions to ask Planning implication
Business criticalityWould failure stop revenue, supply, finance, payroll or regulatory reporting?Critical interfaces require stronger resilience, rollback and parallel-run controls.
Technical complexityAre there custom adapters, Java mappings, BPM, large payloads or unusual protocols?High-complexity scenarios need early proof of concept and more design effort.
DependencyDoes the interface move with an S/4HANA release, SaaS deployment or partner change?Align the wave to the dependent programme and avoid duplicate rework.
Reuse potentialCan a common security, mapping, API or exception pattern support multiple interfaces?Build reusable foundations early to increase later-wave velocity.
ChallengePractical response
Incomplete interface inventoryCombine technical extraction with workshops involving application owners, support teams and business process leads. Validate inactive, duplicate and shadow integrations.
Unsupported adapters or protocolsIdentify gaps during assessment and select supported adapters, APIs, event patterns, managed file-transfer options or an approved complementary platform.
Complex mappings and custom functionsSimplify logic before rebuilding. Use message mapping, XSLT or controlled scripting only where each option is supportable and testable.
BPM/BRM or stateful orchestrationSeparate integration from workflow requirements and redesign on the appropriate SAP or enterprise process-automation service.
Security design left until lateDefine identity, certificates, OAuth flows, secrets, network zones, encryption, logging and privileged access before build waves begin.
Weak monitoring and support readinessCreate business-relevant alerts, dashboards, runbooks, ownership matrices, retry rules and service-management integration; rehearse before go-live.
Business disruption at cutoverUse dependency-based sequencing, message reconciliation, freeze controls, rollback criteria and stakeholder communications.
Cloud cost and capacity surprisesModel volumes, storage, logging, API consumption, non-production usage and growth. Revisit entitlements and retention settings during each wave.

An interface is not proven simply because a message reaches the receiver. Testing should demonstrate that the complete business transaction remains accurate, secure, observable and recoverable.

  • Validate positive, negative, duplicate, late-arriving and reprocessing scenarios.
  • Reconcile record counts, control totals, timestamps, currencies, units and business status across source and target applications.
  • Test peak and sustained volumes, large payloads, connection failures, certificate expiry and downstream unavailability.
  • Confirm logs do not expose personal, financial or commercially sensitive payload data beyond the approved operational need.
  • Prove alert routing, incident creation, support access, restart procedures and business communication paths.
  • Obtain business-owner acceptance for the process outcome and operational-owner acceptance for supportability.

Use a balanced scorecard rather than reporting only the number of migrated interfaces. Useful measures include:

01

Percentage of interfaces assessed, retired, replaced, migrated, modernised and retained.

02

Wave predictability: planned versus completed interfaces and defect escape rate.

03

Message success rate, processing latency and recovery time for priority business flows.

04

Reduction in custom code, duplicate mappings and unsupported connection patterns.

05

Mean time to detect and resolve integration incidents.

06

Release frequency, automated test coverage and transport failure rate.

07

Platform consumption and operating cost compared with the approved business case.

GSC Technolabs can support the full SAP PI/PO to SAP Integration Suite journey—from discovery and migration assessment through target architecture, iFlow development, testing, cutover and managed support. The engagement can be structured as a focused assessment, a phased migration factory or an extension of your internal SAP integration team.

  • Interface inventory, complexity assessment and wave roadmap
  • SAP Integration Suite architecture, connectivity and security design
  • Cloud Integration development, migration tooling and interface modernisation
  • API, event and hybrid-integration design
  • Automated testing, reconciliation, cutover planning and hypercare
  • Monitoring, incident management, optimisation and application managed services
Next step:
Begin with an evidence-based migration assessment. A prioritised interface inventory will clarify cost, risk, reusable patterns and the most practical route to 2027 and beyond.
Is SAP CPI the same as SAP Integration Suite?

Not exactly. SAP CPI is the familiar former name for what SAP now calls the Cloud Integration capability. SAP Integration Suite is the broader platform and includes additional integration capabilities, subject to licensing and service availability.

No. SAP provides assessment and pattern-based migration tooling, but complex mappings, custom code, adapters, BPM scenarios and security designs may require remediation or redesign. Every generated artefact must be reviewed and tested.

Most large estates benefit from phased waves because they reduce operational risk and allow reusable patterns to mature. A big-bang approach may suit a small, well-understood estate with limited dependencies, but it still requires a rehearsed rollback plan.

Yes. Cloud Integration supports hybrid integration patterns, provided network connectivity, identity, certificates, firewall rules and runtime dependencies are designed and operated correctly.

Duration depends on interface count, complexity, business criticality, custom code, testing scope, environments and resource availability. A structured assessment is required before committing to a reliable timeline.

No. Use a fit-for-purpose treatment: retire, replace, migrate, modernise or temporarily retain. Redesign is most valuable where it removes technical debt, enables APIs or events, improves resilience or simplifies future change.

Specific IT Needs?

Your IT challenges aren’t one-size-fits-all.
Unlock a custom strategy designed for your growth and transformation.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.